Department of Public Works (DPW)

Water Sewer Turn On Off Request Word

Water Sewer Turn On or Off Request PDF

 

WELCOME TO THE DEPARTMENT OF PUBLIC WORKS-

810-640-2000 ext 5

810-640-1004 fax

Leah Marshall, Secretary, L.Marshall@geneseetwpmi.gov

Thomas Ellis, T.Ellis@geneseetwpmi.gov

Tanner McHan, tmchan@geneseetwpmi.gov

Kyler Newcomb, K.Newcomb@geneseetwpmi.gov

Robert Ellis, DPW Manager

R.Ellis@geneseetwpmi.gov

2024 CCR – FINAL.docx

2024 CCR – FINAL.pdf

https:/www.cleargeneseewater.org

NPDES Permit – Genesee Twp SWMP :

2024 Beecher Metro District CCR Report

AUTHORIZATION TO DISCHARGE UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of the Federal Water Pollution Control Act (33 U.S.C. 1251 et seq., as amended; the “Federal Act”); Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); Part 41, Sewerage Systems, of the NREPA; and Michigan Executive Order 2019-06,Genesee Charter Township, 7244 North Genesee Road PO Box 215 Genesee, MI 48437 is authorized to discharge from the Municipal Separate Storm Sewer System (MS4) designated as Genesee Twp MS4-Genesee to surface waters of the state of Michigan in accordance with effluent limitations, monitoring requirements, and other conditions set forth in this permit.

Any public comments on this can be sent to R.Ellis@geneseetwpmi.gov